with these rules. The notification may include verbal or written communication or an affixed
written notification on the storage tank system.
1.8.2 A person shall not tamper with, remove, or disregard written notification affixed to the
storage tank system.
1.8.3 A storage tank system or practice that is not in compliance with these rules is in violation
of these rules.
1.8.4 An owner or operator shall not continue to use a storage tank system that is causing a release
and shall expeditiously empty the system or the component that is causing the release until the
system is repaired or replaced, pursuant to these rules.
History: 2014 AACS.
R 29.6152 Permits.
Rule 52. Sections 1.9, 1.9.1, 1.9.2, 1.9.3, 1.9.4, 1.9.5 and 1.9.6 of the LPG code are added as
follows:
1.9 Permits.
1.9.1 An owner or owner’s designee shall submit an application for plan review to the bureau not
less than 30 days before the installation of a LPG storage tank system of more than 2,000 gallon
individual water capacity, more than 4,000 gallon aggregate water capacity, or any container filling
location.
1.9.2 The installation application shall include a plot map that shows all of the following
information:
(a) The locations of buildings, public roadways, railroad mainlines, and power lines.
(b) Storm sewers, sanitary sewers, manholes, and catch basins.
(c) The proposed locations of tanks and buildings.
(d) The location of property lines.
(e) The location of existing tanks, aboveground and underground, within 50 feet (15 meters) of
the installation.
(f) The material of construction, the dimension, and the capacity of each tank.
(g) The manufacturer name and part number of all required container and piping appurtenances.
1.9.3 The bureau shall issue a plan review report within 30 days of the receipt. If the report is not
issued within 30 days, the installation may be constructed according to the submitted plans and
shall comply with these rules.
1.9.4 Upon completion of the installation, the owner or designee shall notify the bureau not fewer
than 7 calendar days before the installation is placed in service. The bureau shall inspect the
installation following the receipt of notification and shall certify the installation if the requirements
of these rules have been met. If the inspection is not made within 7 calendar days of receipt of
notification, the installation may be placed in service and a notarized affidavit shall be submitted
to the bureau attesting to the fact that the installation complies with the plans submitted and
applicable rules.
1.9.5 Upon request, all plans and specifications that are submitted to the bureau for review shall
be returned after the bureau has certified the installation or within 30 working days after
notification to the authority having jurisdiction of the completion of the installation. Plans and
specifications may be marked “confidential – do not copy” when they are submitted.