DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS  
DIRECTOR'S OFFICE  
GENERAL INDUSTRY SAFETY AND HEALTH STANDARD  
(By authority conferred on the director of the department of licensing and regulatory  
affairs by sections 16 and 21 of 1974 PA 154, MCL 408.1016 and 408.1021, and Executive  
Reorganization Order Nos. 1996-2, 2003-1, 2008-4, and 2011-4, MCL 445.2001,  
445.2011, 445.2025, and 445.2030)  
GENERAL INDUSTRY SAFETY AND HEALTH STANDARD  
PART 18. OVERHEAD AND GANTRY CRANES  
R 408.11801 Scope.  
Rule 1801. (1) This standard covers the equipment, installation, maintenance, and  
operation of top running overhead and gantry single and multiple girder cranes in, about,  
and around places of employment in order to safeguard employees.  
(2) This standard does not apply to any of the following:  
(a) Monorails.  
(b) Railway or truck cranes.  
(c) Mine hoists.  
(d) Conveyors.  
(e) Shovels.  
(f) Drag-line excavators.  
(g) Equipment used on construction jobs.  
(h) Systems used to transport people.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11803 Definitions; B to D.  
Rule 1803. (1) "Brake" means a device used for retarding or stopping motion by friction  
or power means.  
(2) "Bridge" means that part of a crane consisting of girders, trucks, end ties, footwalks,  
and the driving mechanism which carries the trolley or trolleys.  
(3) "Bumper" means an energy-absorbing device for reducing impact when a moving  
crane or trolley reaches the end of its permitted travel, or when 2 moving cranes or trolley  
come in contact.  
(4) "Cab" means an operator compartment located on a crane bridge or trolley.  
(5) "Cab operated crane" means a crane controlled by an operator in a cab located on the  
bridge or trolley.  
(6) "Catwalk" means a walkway with handrail and toeboards which are attached to the  
bridge or trolley, or both, for access purposes.  
Page 1  
(7) "Competent person" means a person who has the necessary experience of the crane  
and equipment used in the lifting operation to carry out the function satisfactorily, who is  
capable of identifying an existing or potential hazard in surroundings, or under working  
conditions, that are hazardous or dangerous to an employee, and who has the authority and  
knowledge to take prompt corrective measures to eliminate the hazards.  
(8) "Collector shoe" means a contacting device for collecting current from runway or  
bridge conductors.  
(9) "Conductors, bridge" means the electrical conductors located along the bridge  
structure of a crane to provide power to the trolley.  
(10) "Conductors, runway" means the electrical conductors located along a crane runway  
to provide power to the crane.  
(11) "Controller" means a device or group of devices that serves to govern, in a  
predetermined manner, the power delivered directly to the apparatus to which it is  
connected.  
(12) "Crane" means a top running overhead or gantry crane.  
(13) "Designated" means selected or assigned by the employer or the employer's  
representative as being qualified to perform specific duties.  
(14) "Drag brake" means a brake that provides retarding force without external control.  
History: 1979 AC; 2002 AACS.  
R 408.11804 Definitions; F to M.  
Rule 1804. (1) "Floor-operated crane" means a top running overhead crane that is  
controlled by an operator on a floor or independent platform.  
(2) "Footwalk" means a walkway which has a handrail and which is attached to the bridge  
or trolley for access purposes.  
(3) "Frequent inspection" means a visual examination by the operator or other designated  
personnel, with written records required.  
(4) "Gantry crane" means a crane similar to an overhead crane, except that the bridge for  
carrying the trolley or trolleys is rigidly supported by 1 or more legs running on a fixed rail  
or other runway.  
(5) "Hoist" means a system of power-driven drums, gears, cables, chains, or hydraulic  
cylinders capable of lifting and lowering a load.  
(6) "Hooker" means an employee who by using predetermined lift points attaches the load  
to the hook, in hoisting or setting the load or both.  
(7) "Hot metal crane" means a crane that transports molten metal.  
(8) "Limit switch" means a switch that is operated by some part or motion of a power-  
driven machine or equipment to alter the electric current associated with the machine or  
equipment.  
(9) "Load" means the total superimposed weight on a load block or hook.  
(10) "Load block" means the assembly of hook and shackle, swivel bearing, sheaves, pins,  
and frame, suspended by the hoisting ropes or chain.  
(11) "Magnet" means an electromagnetic device carried on a crane hook that picks up the  
load magnetically.  
(12) "Main switch" means a switch on a crane controlling the entire power supply to the  
crane, except that a magnet and convenience outlet circuit may bypass the main switch.  
Page 2  
(13) "Modified" means a change in design or rating.  
History: 1979 AC; 2002 AACS.  
R 408.11805 Definitions; O to R.  
Rule 1805. (1) "Overhead crane" means a top running crane that has a movable bridge  
carrying a movable or fixed hoisting mechanism for lifting and lowering, moving  
horizontally and traveling on an overhead fixed runway.  
(2) "Periodic inspection" means the inspection of the equipment in place by a designated  
person, making written records of conditions.  
(3) "Power-operated crane" means a crane that has its mechanism driven by electric, air,  
hydraulic, or internal combustion means.  
(4) "Preformed" means to permanently shape wire rope before fabrication into helical  
form.  
(5) "Pulpit" means an operator compartment for a crane located at a fixed position remote  
from the crane.  
(6) "Qualified person" means a person who, through attainment of a recognized degree or  
certificate of professional standing or by extensive knowledge, training, and experience,  
has successfully demonstrated the ability to solve or resolve problems relating to the  
subject matter and work.  
(7) "Rail stop" means a device attached to a rail to stop the movement of a crane beyond  
a fixed point.  
(8) "Rated load" means the maximum load for which a crane or individual hoist is  
designed and built by the manufacturer and shown on the equipment nameplate or  
nameplates.  
(9) "Remote-operated crane" means a crane controlled by an operator not in a pulpit or in  
the cab attached to the crane, by any method other than pendant or rope control.  
(10) "Rigger" means an employee who prepares heavy equipment or loads of materials  
for lifting.  
(11) "Rope" means wire rope, unless otherwise specified.  
(12) "Running sheave" means a sheave that rotates as the load block is raised or lowered.  
(13) "Runway" means an assembly of rails, beams, girders, brackets, and framework on  
which a crane or trolley travels.  
History: 1979 AC; 2002 AACS.  
R 408.11806 Definitions; S to W.  
Rule 1806. (1) "Safety factor" means the ratio of the breaking strength of a piece of  
material or object to the actual load or stress when in use.  
(2) "Seizing" means to bind the end of a wire rope with a soft annealed iron wire.  
(3) "Side pull" means to pull a load with a hoist, chain or cable other than vertically.  
(4) "Stop device" means a device to limit travel of a trolley or crane bridge. It is normally  
attached to a fixed structure and normally does not have energy-absorbing ability.  
Page 3  
(5) "Storage gantry crane" means a gantry type crane of long span usually used for bulk  
storage of materials. The bridge girders are supported on 1 or more legs. It may have 1 or  
more fixed or hinged cantilever ends.  
(6) "Swaged socket" means a fitting into which wire rope is inserted and attached by cold  
forming.  
(7) "Switch" means a device for making, breaking, or for changing the connections in an  
electric circuit.  
(8) "Trolley" means a unit that travels on the bridge rails and carries the hoisting  
mechanism.  
(9) "Trolley travel" means the trolley movement at right angles to the crane runway.  
(10) "Truck" means the unit consisting of a frame, wheels, bearing, and axles that supports  
the bridge girders or trolleys.  
(11) "Wall crane" means a crane which has a jib with or without trolley and which is  
supported from a sidewall or line of columns of a building. It is a traveling type and  
operates on a runway attached to the sidewall or columns.  
History: 1979 AC; 2002 AACS.  
R 408.11807 Adopted and referenced standards.  
Rule 1807. (1) The following standards are adopted by reference in these rules and are  
available from HIS Global, 15 Inverness Way East, Englewood, Colorado, 80112, USA,  
a cost as of the time of adoption of these rules, as stated in this subrule:  
(a) American National Standard Institute ANSI/ASME B30.2, “Overhead and Gantry  
Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist),"  
Standard, 1996 edition. Cost: $60.00.  
(b) ANSI/ASME B30.2.0, "Overhead and Gantry Cranes," Standard, 1967 edition. Cost:  
$60.00.  
(c) ANSI/ASME B30.17, “Overhead and Gantry Cranes (Top Running Bridge, Single  
Girder, Underhung Hoist),” Standard, 1998 edition. Cost: $60.00.  
(2) The standards adopted in these rules are available for inspection at the Department of  
Licensing and Regulatory Affairs, MIOSHA Regulatory Services Section, 530 West  
Allegan Street, P.O. Box 30643, Lansing, Michigan, 48909-8143.  
(3) Copies of the standards adopted in these rules may be obtained from the publisher or  
may be obtained from the Department of Licensing and Regulatory Affairs, MIOSHA  
Regulatory Services Section, 530 West Allegan Street, P.O. Box 30643, Lansing,  
Michigan, 48909-8143, at the cost charged in this rule, plus $20.00 for shipping and  
handling.  
(4) The following Michigan Occupational Safety and Health Administration (MIOSHA)  
Standards are referenced in these rules. Up to 5 copies of these standards may be obtained  
at no charge from the Michigan Department of Licensing and Regulatory Affairs,  
MIOSHA Regulatory services section, 530 West Allegan Street, P.O. Box 30643, Lansing,  
For quantities greater than 5, the cost, at the time of adoption of these rules, is 4 cents per  
page.  
Page 4  
(a) Construction Safety Standard Part 10 “Cranes and Derricks,” R 408.41001 to  
R 408.41099.  
(b) General Industry Safety and Health Standard Part 2 “Walking-Working Surfaces,”  
R 408.10201 to R 408.10241.  
(c) General Industry Safety Standard Part 7 “Guards for Power Transmission,”  
R 408.10701 to R 408.10765.  
(d) General Industry Safety and Health Standard Part 33 “Personal Protective  
Equipment,” R 408.13301 to R 408.13398.  
(e) General Industry Safety Standard Part 39 “Design Safety Standards for Electrical  
Systems,” R 408.13901 to R 408.13905.  
(f) General Industry Safety Standard Part 49 “Slings,” R 408.14901 to R 408.14965.  
(g) General Industry Safety Standard Part 85 “The Control of Hazardous Energy Sources,  
(Lockout/Tagout),” R 408.18501 to R 408.18599.  
History: 2002 AACS; 2005 AACS; 2013 AACS; 2018 AACS.  
R 408.11808 Employer responsibilities.  
Rule 1808. (1) An employer shall comply with the manufacturer's specifications and  
limitations applicable to the operation of cranes. If a manufacturer's specifications are not  
available, then the limitations assigned to the equipment shall be based on the  
determination of a qualified engineer who is competent in the field of equipment  
limitations, and the determination shall be appropriately documented and recorded.  
Attachments that are used with cranes shall not exceed the capacity, rating, or scope  
recommended by the manufacturer.  
(2) An employer shall designate a qualified person to perform all inspections of cranes as  
required by this standard.  
(3) An employer shall limit the use of a crane to the following entities:  
(a) An employee who has been trained and qualified to operate the type of crane to which  
he or she is assigned.  
(b) A learner who is under the direct supervision of a designated operator.  
(c) Designated maintenance personnel while performing their duties.  
(4) An employer shall maintain a crane and its accessories in a condition that will not  
endanger an operator or other employees.  
(5) The original safety factor of the equipment shall not be reduced if modifications or  
changes are made to the equipment. Modifications or changes shall be certified by a  
qualified registered engineer. The capacity, operation, and maintenance instruction plates,  
tags, or decals shall be changed accordingly to reflect any modifications or changes.  
(6) An employer shall comply with all other applicable requirements of this standard.  
(7) The manual provided by the crane manufacturer shall be readily accessible for the  
crane operator's reference at the work site.  
History: 2002 AACS; 2018 AACS.  
CONSTRUCTION, INSTALLATION AND EQUIPMENT  
Page 5  
R 408.11821 Certification; modification; guards; adoption of standards by reference.  
Rule 1821. (1) A top running or gantry crane consisting of a top running bridge with single  
or multiple girders and a top running trolley hoist, erected or modified after June 24, 1973  
and before April 9, 2002, shall be certified by a crane manufacturer or an engineer  
knowledgeable in crane construction, that the new construction or installation, or  
modification conforms to the ANSI/ASME B30.2.0 "Overhead and Gantry Cranes,"  
Standard, 1967 edition, as adopted in R 408.11807.  
(2) A top running or gantry crane consisting of a top running bridge with single or multiple  
girders and a top running trolley hoist, erected or modified after April 9, 2002, shall be  
certified by a crane manufacturer or an engineer knowledgeable in crane construction, that  
the new construction or installation, or modification conforms to the ANSI/ASME B30.2  
"Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top  
Running Trolley Hoist)," Standard, 1996 edition, as adopted in R 408.11807.  
(3) A top running or gantry crane consisting of a top running bridge with a single girder  
and an underhung hoist, erected or modified after August 31, 1971 and before April 9,  
2002, shall be certified by a crane manufacturer or an engineer knowledgeable in crane  
construction, that the new construction, installation, or modification conforms to the  
ANSI/ASME B30.2.0 "Overhead and Gantry Cranes," 1967 edition, as adopted in  
R 408.11807.  
(4) A top running or gantry crane consisting of a top running bridge with a single girder  
and an underhung hoist, erected or modified after April 9, 2002, shall be certified by a  
crane manufacturer or an engineer knowledgeable in crane construction, that the new  
construction, installation, or modification conforms to the ANSI/ASME B30.17 "Overhead  
and Gantry Cranes (Top Running Bridge, Single Girder, Underhung Hoist)" Standard,  
1998 edition, as adopted in R 408.11807.  
(5) Gears, couplings and other means of power transmission, except shafts, where exposed  
to contact, shall be guarded as prescribed in General Industry Safety Standard Part 7  
"Guards for Power Transmission," as referenced in R 408.11807.  
(6) A top running or gantry crane consisting of a top running bridge with single or multiple  
girders and a top running trolley hoist may be modified or rerated if the modifications and  
the supporting structure are checked thoroughly by a qualified engineer or the equipment  
manufacturer and conform to the ANSI/ASME B30.2 "Overhead and Gantry Cranes (Top  
Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)," Standard, 1996  
edition, as adopted in R 408.11807.  
(7) A top running or gantry crane consisting of a top running bridge with a single girder  
and an underhung hoist may be modified or rerated if the modifications and the supporting  
structure are checked thoroughly by a qualified engineer or the equipment manufacturer  
and conform to the ANSI/ASME B30.17 "Overhead and Gantry Cranes (Top Running  
Bridge, Single Girder, Underhung Hoist)" Standard, 1998 edition, as adopted in  
R 408.11807.  
History: 1979 AC; 2002 AACS; 2005 AACS; 2018 AACS.  
R 408.11822 Marking rated capacity; classifications; clearances.  
Page 6  
Rule 1822. (1) The rated capacity of a crane shall be legibly marked on each side of the  
crane. Markings shall be legible from the ground or floor.  
Each load block of the hoisting units of the crane shall be legibly marked with its individual  
rated capacity.  
(2) Each crane designed and manufactured after January 1, 1971 shall have a service class  
rating as prescribed in "CMAA #70--Specifications for Top Running Bridge and Gantry  
Type Multiple Girder Electric Overhead Traveling Cranes," 1970 edition, as shown in  
Appendix B. Additionally the service class rating shall be legibly marked on each crane.  
(3) Clearance from obstructions shall be a minimum of 3 inches overhead and 2 inches  
laterally between the crane and any obstruction.  
(4) Runways of parallel cranes that do not have an intervening wall or structure shall have  
adequate clearance between the 2 bridges.  
(5) The cab of a crane shall be located to afford a minimum of 3 inches clearance from  
all fixed structures within its area of possible movement.  
History: 1979 AC; 2002 AACS; 2005 AACS.  
R 408.11823 Safety factor for hoisting cables.  
Rule 1823. The designed safety factor for the hoisting cable is as follows:  
(a) A hot metal crane shall be not less than 8.  
(b) Any other crane shall be not less than 5.  
History: 1979 AC; 2018 AACS.  
R 408.11824 Wire rope.  
Rule 1824. (1) A wire rope used on a crane shall be repaired or replaced in any of the  
following circumstances:  
(a) One third or more of the original diameter of the outside individual wires is worn.  
(b) There is kinking, crushing, bird-caging, or any other damage that results in distortion  
of the running portion of the wire rope structure.  
(c) The wire rope shows heat or corrosive damage.  
(d) In running ropes, there are 6 randomly distributed broken wires in 1 lay or 3 broken  
wires on 1 strand in 1 lay. In rotation-resistant ropes, 2 randomly distributed broken wires  
in 6 rope diameters or 4 randomly distributed broken wires in 30 rope diameters.  
(e) There are reductions from nominal diameter of more than the following:  
(i) One sixty-fourth of an inch for a diameter to and including 5/16 of an inch.  
(ii) One thirty-second of an inch for a diameter 3/8 of an inch to and including 1/2 of an  
inch.  
(iii) Three sixty-fourths of an inch for a diameter 9/16 of an inch to and including 3/4 of  
an inch.  
(iv) One sixteenth of an inch for a diameter 7/8 of an inch to and including 1 1/8 inches.  
(v) Three thirty-seconds of an inch for a diameter 1 1/4 inches to and including 1 1/2  
inches.  
(f) In standing ropes, there are more than 2 broken wires in 1 lay in sections beyond end  
connections or more than 1 broken wire at an end connection.  
Page 7  
(2) Wire rope discarded from a crane under subrule (1) of this rule shall not be used for  
any other load-carrying service.  
(3) Wire rope for a crane bent to form an eye shall be equipped with a metal thimble.  
(4) A wire rope end fitting shall be a clamp, swage, or a zinc or equivalent poured socket.  
Before cutting wire rope, seizings shall be placed as follows:  
(a) One seizing on each side of the cut on preformed wire rope;  
(b) Two seizings on each side of 7/8 inch size or smaller nonpreformed wire rope.  
(c) Three seizings on each side of 1 inch or larger size nonpreformed wire rope.  
(5) Wire rope that has an independent wire rope core shall be used on all molten metal  
applications and in an area where the environmental atmosphere will cause deterioration  
of a hemp center.  
(6) Wire rope shall be stored in a manner to prevent damage or deterioration.  
(7) The unreeling or uncoiling of wire rope shall be done as recommended by the rope  
manufacturer and with care to avoid kinking or inducing a twist.  
(8) Rope clips attached with u-bolts shall have the u-bolts on the dead or short end of the  
rope. Spacing and number of all types of clips shall be in accordance with the clip  
manufacturer's recommendation. Clips shall be drop-forged steel in all sizes manufactured  
commercially. When a newly installed rope has been in operation for an hour, all nuts on  
the clip bolts shall be retightened. See Appendix A.  
(9) Replacement rope shall meet or exceed the original specifications set forth by the  
crane manufacturer.  
(10) If a load is supported by more than 1 part of rope, then the tension in the parts shall  
be equalized.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11825 Hooks; load blocks.  
Rule 1825. (1) A crane hook shall be discarded if either of the following provisions  
applies:  
(a) The throat opening is more than 15% greater than the manufactured size.  
(b) The hook has more than a 10-degree twist from a vertical center line drawn through  
the hook socket.  
(2) A hook shall be equipped with a latch, unless the application makes the use of a latch  
impractical as determined by a qualified person. When required, a latch shall be provided  
to bridge the throat opening of the hook for the purpose of retaining slings, chains, or other  
equipment, under slack conditions.  
(3) Load blocks shall be of the enclosed type and shall be guarded against rope jamming  
during normal operations.  
History: 1979 AC; 2002 AACS.  
R 408.11826 Rescinded.  
History: 1979 AC; 2002 AACS.  
Page 8  
R 408.11827 Sheaves.  
Rule 1827. (1) Sheave grooves shall be smooth and free from defects that could cause  
rope damage.  
(2) Sheaves carrying ropes that can be momentarily unloaded shall be provided with close  
fitting guards or other suitable devices to guide the rope back into the groove when the load  
is applied again.  
(3) Sheaves in the bottom block shall be equipped with close fitting guards that will  
prevent ropes from becoming fouled when the block is lying on the ground with ropes  
loose.  
(4) Pockets and flanges of sheaves used with hoist chains shall be of dimensions that the  
chain does not catch or bind during operation.  
(5) All running sheaves shall be equipped with means for lubrication. Permanently  
lubricated, sealed, or shielded bearings meet this requirement.  
History: 2002 AACS.  
R 408.11831 Rescinded.  
History: 1979 AC.  
R 408.11832 Trolley stops.  
Rule 1832. (1) Stops shall be provided at the limits of travel of the trolley.  
(2) The stops shall be fastened to resist the forces applied when contacted.  
(3) A stop engaging the tread of the wheel shall be of a height not less than that of the  
wheel radius. A stop which engages other parts of the crane is preferable.  
History: 1979 AC.  
R 408.11833 Bridge bumpers; trolley bumpers; rail sweeps.  
Rule 1833. (1) A crane shall be provided with bumpers or other automatic means  
providing equivalent effect, unless the crane travels at a slow rate of speed and has a faster  
deceleration rate due to the use of sleeve bearings, is not operated near the ends of bridge  
and trolley travel, is restricted to a limited distance by the nature of the crane operation and  
there is no hazard of striking any object in the limited distance, or is used in similar  
operating conditions. The bumpers shall be capable of stopping the crane, not including  
the lifted load, at an average rate of deceleration of not more than 3 feet/s/s (per second,  
per second) when traveling in either direction at 20% of the rated load speed. Bumpers  
shall meet both of the following requirements:  
(a) A bumper shall have sufficient energy-absorbing capacity to stop the crane when  
traveling at a speed of not less than 40% of rated load speed.  
(b) A bumper shall be mounted so that there is no direct shear on bolts.  
(2) Bumpers shall be designed and installed to minimize parts falling from the crane in  
case of breakage.  
Page 9  
(3) A trolley shall be provided with bumpers or other automatic means of equivalent  
effect, unless the trolley travels at a slow rate of speed, is not operated near the ends of  
bridge and trolley travel, is restricted to a limited distance of the runway and there is no  
hazard of striking any object in the limited distance, or is used in similar operating  
conditions. The bumpers shall be capable of stopping the trolley, not including the lifted  
load, at an average rate of deceleration of not more than 4.7 feet/s/s (per second, per second)  
when traveling in either direction at 1/3 of the rated load speed. Trolley bumpers shall meet  
both of the following requirements:  
(a) When more than 1 trolley is operated on the same bridge, each shall be equipped with  
bumpers or equivalent on their adjacent ends.  
(b) Bumpers or equivalent shall be designed and installed to minimize parts falling from  
the trolley in case of broken or loosened mounting connections.  
(4) Bridge trucks shall be equipped with rail sweeps that extend below the top of the rail  
and project in front of the truck wheels.  
History: 1979 AC; 2002 AACS.  
R 408.11835 Ladders; foot-walks; stairways; escape devices.  
Rule 1835. (1) Access to crane. Access to the car or bridge walkway shall be by a  
conveniently placed fixed ladder, stairs, or platform requiring no step over any gap  
exceeding 12 inches (30 cm). Fixed ladders shall comply with General Industry Safety and  
Health Standard Part 2 “Walking-Working Surfaces,” as referenced in R 408.11807.  
(2) A foot-walk or a cat-walk for or on a crane shall have a guardrail system as prescribed  
in General Industry Safety and Health Standard Part 2 “Walking-Working Surfaces,” as  
referenced in R 408.11807. A foot-walk shall be of rigid construction and designed to  
sustain a distributed load of not less than 50 pounds per square foot, and shall have an  
anti-slip surface.  
(3) An employer shall ensure that a safe method of escape is provided in case of fire or  
other emergency situation on a cab-operated crane.  
(4) A gantry crane shall have fixed ladders or stairways extending from the ground to the  
foot-walk or cab platform.  
(5) Toeboards and handrails for foot-walks. Toeboards and handrails shall comply with  
General Industry Safety and Health Standard Part 2 “Walking-Working Surfaces,” as  
referenced in R 408.11807.  
(6) Ladders shall be permanently and securely fastened in place and constructed in  
compliance with General Industry Safety and Health Standard Part 2 “Walking-Working  
Surfaces,” as referenced in R 408.11807.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11837 Rescinded.  
History: 1979 AC; 2002 AACS.  
Page 10  
R 408.11841 Brakes and restraints.  
Rule 1841. (1) An overhead or gantry crane bridge which is powered shall be equipped  
with an operable brake, non-coasting mechanical drive, or other braking means. The brake  
or drive shall be capable of stopping the bridge within a distance, in feet, equal to 10% of  
the full load speed in feet per minute when traveling at full speed with full load.  
(2) A trolley of a crane shall meet the requirements of subrule (1) of this rule.  
(3) A crane that is being used out-of-doors shall have a positive mechanical restraint, such  
as, but not limited to, an automatic rail clamp, to secure the crane against wind movement  
while parked. If clamps act on the rail heads, beads or weld flash on the rail heads shall be  
ground off. A positive mechanical restraint shall be utilized when the crane is parked in an  
area where the potential exposure to wind is prevalent.  
History: 1979 AC; 2002 AACS.  
R 408.11843 Controls.  
Rule 1843. (1) A pendant, radio, cab, pulpit control station, and a controller in a cab  
operated crane shall be permanently identified by function and direction. Control boxes  
shall be constructed to prevent electrical shock.  
(2) Rope controls for a floor-operated crane shall be equipped with an arrow attached to  
the rope showing the direction of travel when the rope is pulled.  
(3) A pendant, radio, cab, or pulpit control station shall be equipped with a positive stop  
device, colored red, to disconnect all motors.  
(4) A crane shall be equipped with a main switch which can be locked out. An employer  
shall establish a written lockout procedure which shall be used in connection with  
R 408.11872 and R 408.11875. Lockout shall conform to the requirements prescribed in  
General Industry Safety Standard Part 85 “The Control of Hazardous Energy Sources,  
(Lockout/Tagout),” as referenced in R 408.11807.  
(5) A controller on a rope, pendant, or radio-controlled crane, when released from the  
"on" position, shall automatically return to the "off" position.  
(6) A transmitter for a radio-controlled crane shall be stored in a locked cabinet or in a  
supervised storage area when not in use.  
(7) All cranes shall have an operable over-travel limit switch in the hoisting direction. The  
switch shall be located so that it is tripped under all conditions to prevent contact of the  
hook or block with the hoist.  
(8) A crane that is not equipped with spring return controllers or momentary contact push  
buttons shall have a device which will disconnect all motors from the line if power fails  
and which will not permit restarting until the controller handle is brought to the off position  
or a reset switch or button is operated.  
(9) The control circuit voltage shall not be more than 600 volts for A.C. or D.C. current.  
(10) The voltage at pendant push-buttons shall not be more than 150 volts for A.C. and  
300 volts for D.C.  
(11) If multiple conductor cable is used with a suspended push-button station, then the  
station shall be supported in a manner that will protect the electrical conductors against  
strain.  
(12) Cab-operated cranes shall have lever-operated manual controllers and master  
switches that have a spring-return arrangement, off-point detent, or off-point latch. The  
Page 11  
controller operating handle shall be located within reach of the operator and, as far as  
practicable, the movement of each controller handle shall be in the same general directions  
of the resultant movements of the load.  
(13) Equipment and wiring shall be as prescribed in General Industry Safety Standard  
Part 39 “Design Safety Standards for Electrical Systems,” as referenced in R 408.11807.  
(14) The control for the bridge and trolley travel shall be located so that the operator can  
face the direction of travel.  
(15) Push buttons in pendant stations shall return to the above position when released by  
the operator.  
(16) Automatic cranes shall be designed so that all motions will failsafe if any malfunction  
of operation occurs.  
(17) A remote-operated crane shall function so that if the control signal for any crane  
motion becomes ineffective, the crane motion shall stop.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11844 Equipment.  
Rule 1844. (1) Electrical equipment shall be located or enclosed so that live parts are not  
exposed to accidental contact under normal operating conditions.  
(2) Electric equipment shall be protected from dirt, grease, oil, and moisture.  
(3) Guards for live parts shall be substantial and located so that they cannot be accidentally  
deformed to make contact with live parts.  
(4) Enclosures for resistors shall have openings to provide adequate ventilation and shall  
be installed to prevent the accumulation of combustible matter too near to hot parts.  
Resistor units shall be supported to be free as possible from vibration.  
(5) The power supply to the runway conductors shall be controlled by a switch or circuit  
breaker that is located on a fixed structure, is accessible from the floor, and is capable of  
being locked in the open position. A switch or circuit breaker that is of the enclosed type  
and is capable of being locked in the open position shall be provided in the leads from the  
runway conductors on a cab-operated crane. A means of opening the switch or circuit shall  
be located within reach of the operator. A switch or circuit breaker that is of the enclosed  
type and is capable of being locked in the open position shall be provided in the leads from  
the runway conductors on a floor-operated crane. The disconnect shall be mounted on the  
bridge or foot-walks near the runway conductors. One of the following types of  
floor-operated disconnects shall be provided:  
(a) Nonconductive rope attached to the main switch.  
(b) An under-voltage trip for the main circuit breaker operated by an emergency stop  
button in the pendant push button in the pendant pushbutton station.  
(c) A main line contactor operated by a switch or pushbutton in the pendant pushbutton  
station.  
(6) A crane using a lifting magnet shall have a separate magnet circuit switch that is of  
the enclosed type and is capable of being locked in the open position. Means for  
discharging the inductive load of the magnet shall be provided.  
(7) Runway conductors of the open type mounted on the crane runway beams or overhead  
shall be located or guarded so that persons entering or leaving the cab or crane foot-walk  
Page 12  
will not come into contact with them. On the effective date of this rule, open type  
conductors shall not be installed on cab-operated runway beams.  
(8) When a service receptacle for an extension lamp is provided in the cab or on the bridge  
of a cab-operated crane, it shall be a grounded 3-prong type permanent receptacle and shall  
not be more than 300 volts.  
History: 2002 AACS; 2013 AACS; 2018 AACS.  
R 408.11845 Warning devices.  
Rule 1845. (1) A crane, shall be equipped with a warning device, such as a flashing light,  
horn, bell, or siren. An operator shall use a warning device before starting and  
intermittently while traveling in an occupied area.  
(2) A wind-indicating device shall be provided on an outdoor storage gantry type crane  
and on an outdoor overhead crane. The device shall give a visual or audible alarm to the  
operator at a predetermined wind velocity to be determined by the employer in accordance  
with the manufacturer's recommendation or design.  
History: 1979 AC; 2002 AACS.  
R 408.11847 Tool storage, housekeeping, and fire extinguishers.  
Rule 1847. (1) Tools and other necessary articles shall be stored in a secured container  
and not allowed to be loose, in or about a crane.  
(2) A class "C" or multipurpose fire extinguisher shall be provided and maintained  
accessible to the crane operator of a cab-operated crane a carbon tetrachloride extinguisher  
shall not be used.  
(3) An employer shall ensure that the crane operator is knowledgeable in the operation of  
the fire extinguishers.  
(4) Good housekeeping shall be maintained at all times. The crane operator shall keep the  
access area and the crane cab clear of all loose objects such as tools, bolts, boards, rags, or  
other materials.  
History: 1979 AC; 2002 AACS.  
OPERATORS AND OPERATIONS  
R 408.11851 Qualifications.  
Rule 1851. An employer shall be able to demonstrate that an employee is trained and  
qualified to operate a crane prior to authorizing the employee to operate a crane.  
History: 1979 AC; 1988 AACS; 2002 AACS; 2013 AACS.  
R 408.11852 Training.  
Page 13  
Rule 1852. (1) An employer shall train a prospective operator before the employee's  
assignment as an operator of a crane. An employer shall ensure that a designated individual  
authorized by the employer to perform the training has the knowledge, training, and  
experience to train and to evaluate the competence of the prospective operator and to  
provide refresher training to an operator when it is required. Training shall include all of  
the following:  
(a) Capacities of equipment and attachments.  
(b) Purpose, use, and limitation of controls.  
(c) How to make daily checks.  
(d) The energizing sequences, including pneumatic, hydraulic, and electrical sequences.  
(e) Start-up and shutdown procedures.  
(f) Emergency shutdown procedures.  
(g) General operating procedures.  
(h) All basic signaling procedures, including hand, radio, or telephone signals, where  
required.  
(i) Knowledge of this standard and other applicable MIOSHA standards, and company  
rules and regulations.  
(j) Practice in operating the assigned equipment through the mechanical functions  
necessary to perform the required task.  
(k) Maximum rated capacity of the crane.  
(2) Training shall consist of a combination of formal instruction, practical training, and  
testing of the operator's performance, as required in R 408.11853.  
(3) Refresher training in relevant topics shall be provided to an operator under any of the  
following conditions:  
(a) An operator has been observed to operate the crane in an unsafe manner.  
(b) An operator has been involved in an accident or a near-miss incident.  
(c) An operator has received an evaluation that reveals that the operator is not operating  
the crane safely.  
(d) An operator is assigned to a different type of crane.  
(e) A condition in the workplace changes that could affect safe operation of the crane.  
(4) Maintenance personnel, crane inspectors, and all other users of the crane shall be  
trained as required in subrule (1) of this rule.  
(5) A rigger shall be trained in all of the following:  
(a) The requirements of this standard.  
(b) Knowledge of General Industry Safety Standard Part 49 “Slings,” as referenced in  
R 408.11807.  
(c) Knowledge of General Industry Safety and Health Standard Part 33 “Personal  
Protective Equipment,” as referenced in R 408.11807.  
(d) Maximum capacity of the crane.  
(e) Rigging procedures.  
(f) Company rules and regulations.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11853 Testing.  
Page 14  
Rule 1853. (1) An employer shall test the knowledge and ability of an employee before  
authorizing him or her to operate a crane. The test shall determine all of the following with  
respect to the employee:  
(a) Ability to operate the equipment through its functions necessary to perform the  
required jobs.  
(b) Knowledge of equipment.  
(c) Knowledge of daily checks and inspection requirements.  
(d) Knowledge of applicable MIOSHA standards and company rules and regulations.  
(2) A performance test shall be given to determine that the employee can operate the  
assigned crane or cranes through the functions necessary to perform the required task.  
History: 1979 AC; 1989 AACS; 2002 AACS.  
R 408.11854 Permits.  
Rule 1854. (1) An employer shall provide an employee with a permit to operate a crane  
only after the employee meets the requirements prescribed in R 408.11852, and  
R 408.11853.  
(2) An employee being trained is exempt from the permit requirement for a period of not  
more than 30 calendar days if the employee is under the supervision of an individual who  
is authorized by the employer and who has the knowledge, training, and experience to train  
operators and to evaluate their competence, and if the training period does not endanger  
the trainee or other employees.  
(3) A permit shall be carried by an operator or be available upon request of a department  
representative at all times during working hours.  
(4) A permit shall indicate the type of crane or cranes an operator has been trained on and  
is qualified to operate, as required in R 408.11852.  
(5) A permit to operate a crane is valid only with the employer who issued the permit, and  
the permit shall be issued for a period of not more than 3 years.  
(6) A permit shall contain all of the following information (see sample permit):  
(a) Firm name.  
(b) Operator's name.  
(c) Operator I.D. number, if any.  
(d) Name of issuing authority.  
(e) Type or types of crane authorized to operate.  
(f) Operator restrictions, if any. The permit shall state the nature of the restriction.  
(g) Date issued.  
(h) Date expiring.  
(7) A sample permit is set forth as follows:  
SAMPLE PERMIT  
CRANE OPERATOR PERMIT  
(Firm Name)  
Operator's Name  
Page 15  
Operator's Number  
Is Authorized To Operate:(Insert Type of Crane(s) Authorized)  
Restrictions:(Explanation of Restrictions)  
Date Issued: (Month – Day – Year)  
Date Expiring: (Month – Day – Year)  
By Issuing Authority: ____________________________________________________  
Title  
History: 2002 AACS; 2018 AACS.  
R 408.11855 Limitations on use of cranes.  
Rule 1855. (1) An employer shall limit the use of a crane to the following persons:  
(a) An employee who is trained and is qualified to operate the type of crane to which he  
or she is assigned.  
(b) A learner under the direct supervision of a designated operator.  
(c) Designated maintenance personnel while performing their duties.  
(2) An employer shall establish and enforce a safe procedure, applicable to authorized  
employees, for boarding and leaving an overhead cab-operated crane.  
(3) An employer shall assure that an unauthorized employee does not enter a crane cab or  
pulpit.  
(4) An employer shall limit the use of a crane to its maximum rated capacity, except  
during rated load test as prescribed in R 408.11874.  
History: 1979 AC; 2002 AACS; 2005 AACS.  
R 408.11857 Reporting defects.  
Rule 1857. An operator shall report any defects in a crane to the supervisor.  
History: 1979 AC; 2002 AACS.  
R 408.11859 Personal protective equipment.  
Rule 1859. (1) An operator and an employee directing a lift shall use the personal  
protective devices required in the area.  
(2) If the top of the load is not lifted to a height of more than 5 feet, then the load is not  
considered an overhead hazard.  
History: 1979 AC; 1983 AACS; 2002 AACS; 2013 AACS.  
Page 16  
R 408.11861 General conduct of operators.  
Rule 1861. (1) An operator, when starting on duty shall comply with both of the following  
provisions:  
(a) Shall not close the main switch or emergency contactor until checking to see if anyone  
is on the crane and if a warning sign is on the crane, hook, or main switch.  
(b) Shall test all controls, limit switches, and brakes. When a load approaches the rated  
load, the operator shall test the hoisting brakes by raising the load a few inches and applying  
the brakes.  
(2) A hoisting limit switch on a crane or hoisting means shall not be used as an operating  
control unless the crane is also equipped with a backup limit switch.  
(3) A load shall not be lowered below a point where less than 2 full wraps of wire rope  
remain on the hoisting drum.  
(4) If there is doubt concerning the safety of a crane or hoisting means, then an operator  
shall stop the crane and report the condition creating the doubt to the supervisor.  
(5) In case of power failure, an operator shall place all controllers in the "off" position.  
(6) An operator leaving a crane unattended shall land any attached load, place the  
controllers in the "off" position, and open the main switch. Before closing a main switch,  
an operator shall make sure all controllers are in the "off" position. The main switch need  
not be opened on a pendant-controlled crane if the crane is left unattended for short periods.  
History: 1979 AC; 2002 AACS.  
Editor's Note: An obvious error in R 408.11862 was corrected at the request of the promulgating agency,  
pursuant to Section 56 of 1969 PA 306, as amended by 2000 PA 262, MCL 24.256. The rule containing the  
error was published in Annual Administrative Code Supplement, 2002. The memorandum requesting the  
correction was published in Michigan Register, 2013 MR 21.  
R 408.11863 Signals.  
Rule 1863. An operator shall respond to signals only from the employee directing a lift.  
However, he shall obey at all times an emergency stop signal from any employee. The  
signals given an operator shall conform to Table 1. When 2 or more cranes are used to lift  
a load, a designated employee shall give all signals.  
Page 17  
STANDARD HAND SIGNALS FOR CONTROLLING OVERHEAD AND GANTRY CRANES  
Table 1  
BRIDGE TRAVEL.  
LOWER.  
HOIST.  
Arm extended forward, hand  
With arm extended downward,  
With forearm vertical, forefinger  
open and slightly raised, make  
forefinger pointing down, move  
pointing up, move hand in small  
pushing motion in direction of  
hand in small horizontal circles.  
horizontal circle.  
travel.  
TROLLEY TRAVEL.  
STOP.  
EMERGENCY STOP.  
Arm extended, palm down, move  
hand rapidly right and left.  
Palm up, fingers closed, thumb  
pointing in direction of motion,  
jerk hand horizontally.  
Arm extended, palm down, hold  
position rigidly.  
MOVE SLOWLY.  
MULTIPLE TROLLEYS.  
Hold up one finger for block  
marked “1” and two fingers for  
block marked “2”, Regular  
signals follow.  
Use one hand to give any motion  
signal and place other hand  
motionless in front of hand  
giving the motion signal. (Hoist  
slowly shown as example.)  
MAGNET  
IS  
DISCONNECTED.  
Crane operator spreads both  
hands apart – palms up.  
History: 1979 AC; 2018 AACS.  
Page 18  
R 408.11865 Lifting.  
Rule 1865. (1) An operator of a crane shall not carry a load over an employee.  
(2) A crane shall not be used to make a side pull, except where it has been specifically  
established by a qualified person who has determined all of the following:  
(a) Various parts of the crane will not be overstressed.  
(b) The hoist rope will not bear or rub against other members of the crane, such as the  
girders or trolley frame, except members specifically designed for such contact.  
(c) A side pull will not cause the hoist rope to be pulled out of the sheaves or across drum  
grooves.  
(d) A side pull will not result in excessive swinging of the load block or load.  
(3) Compressed gases shall be lifted only by a cradle or enclosed platform.  
(4) An employee shall not ride a hoisting device, such as a magnet, hook, ball, or load,  
except on a work platform. The work platform shall meet all of the requirements as  
prescribed in Construction Safety Standard Part 10 “Cranes and Derricks,” as referenced  
in R 408.11807.  
(5) The work platform shall be suspended from the top 4 corners and fastened to the  
structural floor member and shall have the point of suspension at the hook fixed so that it  
cannot be accidentally disengaged.  
(6) When attaching or moving a load, the operator, rigger, or hooker shall make sure of  
all of the following:  
(a) The hoisting rope or chain is free of kinks or twists and not wrapped around the load.  
(b) The load is attached to the load block hook by means of a sling or other approved  
device.  
(c) The sling and load will clear all obstacles or obstructions.  
(d) The load is balanced and secured before lifting the load more than a few inches.  
(e) Multiple lines are not twisted around each other.  
(f) The hook is brought over the load in a manner to prevent swinging.  
(g) There is no sudden acceleration or deceleration of the moving load.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11871 Initial and shift inspections.  
Rule 1871. (1) New, reinstalled, altered, repaired, and modified cranes shall be inspected  
by a designated person before initial use to verify compliance with applicable provisions  
of these rules. Inspection of altered, repaired, and modified cranes may be limited to the  
provisions affected by the alteration, repair, or modification, as determined by a qualified  
person.  
(2) At the beginning of each shift during which a crane is used, visual inspections shall  
be made in accordance with Table 2. A visual inspection shall be limited to that which can  
be made from a cat-walk or other safe observation point. Any defects shall be reported to  
a supervisor.  
Page 19  
TABLE 2  
SHIFT/OPERATOR INSPECTION CHECKS  
INSPECTION ITEM  
DESCRIPTION OF INSPECTION CHECK POINTS  
Tagged Crane or Hoist Check that crane or hoist is not tagged with an out-of-order sign.  
Control Devices  
Brakes  
Test run that all motions agree with control device markings.  
Check that all motions do not have excessive drift and that  
stopping distances are normal.  
Check for damage, cracks, nicks, gouges, deformations of the  
throat opening, wear on saddle or load bearing point, and twist.  
Refer to the manual furnished by the original manufacturer of the  
crane.  
Hook  
Hook Latch  
Wire Rope  
If a hook latch is required, check for proper operation.  
Check for broken wires, broken strands, kinks, and any  
deformation or damage to the rope structure.  
Check that the wire rope is properly reeved and that rope parts  
are not twisted about each other.  
Reeving  
Check that the upper limit device stops lifting motion of the hoist  
load block before striking any part of the hoist or crane.  
Limit Switches  
Oil Leakage  
Unusual Sounds  
Check for any sign of oil leakage on the crane and on the floor  
area beneath the crane.  
Check for any unusual sounds from the crane or hoist mechanism  
while operating the crane and hoist.  
Warning and Safety Check that warning and other safety labels are not missing and  
Labels  
that they are legible.  
Housekeeping  
Lighting  
and Check area for accumulation of material, trip or slip hazards, and  
poor lighting.  
History: 1979 AC; 2002 AACS; 2018 AACS.  
R 408.11872 Frequent and periodic inspections.  
Rule 1872. (1) Inspections shall be made as designated in this subrule and Table 3.  
(a) An employer shall establish an inspection schedule based on usage and classification  
as described in this subrule and Appendix B.  
Page 20  
(b) The inspection procedure for cranes in regular service is divided into 2 general  
classifications based upon the intervals at which inspection should be performed. The  
intervals in turn are dependent upon the nature of the critical components of the crane and  
the degree of its exposure to wear, deterioration, or malfunction. The 2 general inspection  
classifications are designated as frequent and periodic, with respective intervals between  
inspections as specified in this rule.  
(c) Each crane designed and manufactured prior to January 1, 1971 shall be inspected at  
least monthly. The inspection schedule may be modified based on documented inspection  
and repair history and a qualified person's recommendations.  
(2) Frequent inspection includes examinations by a designated person who makes  
required records, as follows:  
(a) Monthly to quarterly (class C) or at intervals of 100 hours of use, whichever comes  
first. Frequent inspection includes observations during operation and of items listed in  
Table 3.  
(b) A designated person shall determine whether conditions found during the inspection  
constitute a hazard and whether a more detailed inspection is required.  
(3) Periodic inspection includes inspection of the equipment in place by a designated  
person who makes records as listed in Table 3 and as follows:  
(a) Annually or at intervals of 500 hours of use, whichever comes first. Periodic  
inspections include observations during operation and of items listed in Table 3.  
(b) Conditions of extreme duty cycle, heat, and corrosive or climatic extremes indicate a  
need for more frequent inspections before use.  
(c) Cranes with multiple service classifications shall be inspected in accordance with the  
highest rated duty classification.  
(d) A designated person shall determine whether conditions found during an inspection  
constitute a hazard and whether disassembly is required for additional inspections.  
(4) A crane which is used in infrequent service, that is, which has been idle for a period  
of 1 month or more, shall be inspected before being placed in service.  
TABLE 3  
FREQUENT – PERIODIC MANDATORY INSPECTION CHECKLIST  
Frequent – F - Periodic - P  
BRIDGE STRUCTURAL  
Guards & Covers  
Bumpers  
TROLLEY STRUCTURAL  
Steel Frame  
Connection Hardware  
Load Beam  
Maintenance Platform  
Handrails  
Rail Sweeps  
Bumpers  
Guards & Covers  
Alignment & Tracking  
TROLLEY MECHANICAL  
F
F
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
Rail Sweeps  
Cat-walk & Railings  
General Structure & Welds  
Capacity Signs  
F
F
F
F
F
F
Hand Rails  
Trolley Rail & Stops  
BRIDGE MECHANICAL  
Motor  
P
Page 21  
TABLE 3  
FREQUENT – PERIODIC MANDATORY INSPECTION CHECKLIST  
Frequent – F - Periodic - P  
Brake & Hydraulics  
Gear Case  
Couplings  
Line Shaft Bearings  
Wheels  
Wheel Gearings  
Wheel Bearings  
BRIDGE ELECTRICAL  
Lights  
Electric Control Brake  
Master Switches  
Runway Collectors  
Trolley Conductors  
Resistors  
Soft Start or Inverter  
HOIST STRUCTURAL  
Steel Frame Condition  
Capacity Markings  
Guards & Covers  
Connection to Trolley  
HOIST ELECTRICAL (MAIN)  
General Wiring & Conduits  
Motor(s)  
F
F
F
F
F
F
F
P
P
P
P
P
P
P
Motor  
Brake  
Gear Case  
Couplings  
F
F
P
P
P
P
P
F
F
Wheels  
TROLLEY ELECTRICAL  
General Wiring & Conduits  
Motor  
F
F
F
F
F
F
F
F
F
P
P
P
P
P
P
P
P
P
F
F
F
F
F
F
F
P
P
P
P
P
P
P
Control Panels  
Control Operations  
Motor Resistors  
Soft Start or Inverter  
Hoist/Trolley Conductors  
Limit Switch(s)  
Electric Control Brake(s)  
HOIST MECHANICAL  
Motor  
P
P
P
P
F
F
F
F
F
F
F
P
P
P
P
P
P
P
P
P
P
P
P
F
F
F
Brake Drum  
Holding Brake  
Mechanical Load Brake  
Gear Case  
Coupling(s)  
Upper Sheave(s)  
Rope Drum  
F
F
F
F
F
F
F
P
P
P
P
P
P
P
P
P
P
P
P
Control Panel  
Motor Resistors  
Limit Switch(s)  
Soft Start or Inverter  
Electric Control Brake(s)  
Overload Guard  
Brake Coil  
Power Limit Switch  
Cable Reels  
Wire Rope  
F
F
F
F
Bottom Block Assembly  
Hook & Latch  
Equalizer Sheave  
TEST RUN  
Bridge  
Trolley  
F
F
F
F
F
F
F
F
P
P
P
P
Main Hoist  
Control Cables  
Auxiliary Hoist  
VERIFICATION  
Inspection Accepted/Date  
Customer Signature  
MISCELLANEOUS  
Warning Tag  
Capacity Markings  
Wind Indicators  
Rail Clamps  
MAIN POWER SUPPLY  
Main Line Conductors  
Main Line Collectors  
HOIST STRUCTURAL (AUXILIARY)  
Steel Frame Condition  
Capacity Markings  
Guards & Covers  
Connection to Trolley  
F
F
P
P
F
F
P
P
P
P
P
P
F
F
F
F
P
P
P
P
F
F
F
Page 22  
TABLE 3  
FREQUENT – PERIODIC MANDATORY INSPECTION CHECKLIST  
Frequent – F - Periodic - P  
HOIST ELECTRICAL (AUXILIARY)  
Hour Meter Readings  
Operator Instruction Manual  
Maintenance Manual  
Runway, Rails, Clips, Bars  
Proper License  
Warning Devices  
Spare Batteries  
Recharging Unit  
Transmitter Storage Location  
HOIST MECHANICAL (AUXILIARY)  
Motor  
Brake Drum  
Holding Brake  
Mechanical Load Brake  
Gear Case  
Coupling(s)  
Upper Sheave(s)  
Rope Drum  
P
P
P
P
P
P
P
P
P
General Wiring & Conduits  
Motor(s)  
Control Panel  
Motor Resistors  
Limit Switch(s)  
Soft Start or Inverter  
Electric Control Brake(s)  
Overload Guard  
F
F
F
F
F
F
F
P
P
P
P
P
P
P
P
P
P
P
P
F
F
F
F
F
Brake Coil  
Power Limit Switch  
Cable Reels  
F
F
F
F
F
F
F
F
F
F
F
P
P
P
P
P
P
P
P
P
P
P
P
Control Cables  
RADIO CONTROL ELECTRICAL  
Conduits & Fittings  
Wiring & Connections  
Control Panels  
Radio/Manual Switch  
Receiver Antenna  
Transmitter Functions  
Transmitter Emergency Stop  
TROLLEY CONTROL PANELS  
Contactors  
F
F
F
F
F
F
F
P
P
P
P
P
P
P
Wire Rope  
Bottom Block Assembly  
Hook & Latch  
F
F
F
F
Equalizer Sheave  
PENDANT CONTROL  
Push Button Festoon Condition  
Push Button Pendant Condition  
Push Button Legend Markings  
Push Button Strain Relief  
Cable Reel(s)  
Pendant Balancer  
Operation of E-Stop  
Warning Tag on Push Button  
BRIDGE CONTROL PANELS  
Line Contactor & Knife Switch  
Bridge Contactors  
Arch Shields  
F
F
F
F
F
F
P
P
P
P
P
P
Arch Shields  
Wiring  
Grounds  
Resistors  
F
F
F
F
F
F
F
F
P
P
P
P
P
P
P
P
Doors Closed  
AUXILIARY HOIST CONTROL PANELS  
Contactors  
Arch Shields  
Wiring  
Grounds  
Resistors  
Doors Closed  
Overload Relays  
SAFETY  
F
F
F
F
F
F
P
P
P
P
P
P
P
F
F
F
F
F
F
F
P
P
P
P
P
P
P
Wiring  
Grounds  
Resistors  
Doors Closed  
Fire Extinguisher  
Clearance Crane/Obstruction  
F
F
P
P
General  
Condition  
&
P
MAIN HOIST CONTROL PANELS  
Housekeeping  
Page 23  
TABLE 3  
FREQUENT – PERIODIC MANDATORY INSPECTION CHECKLIST  
Frequent – F - Periodic - P  
TROLLEY POWER SUPPLY  
Trolley Conductors  
Trolley Line Collectors  
Contactors  
Arch Shields  
Wiring  
Grounds  
Resistors  
F
F
F
F
F
F
F
P
P
P
P
P
P
P
F
F
FESTOON SYSTEM POWER SUPPLY  
Trolley Pusher Arm  
Festoon Span Conductors  
Festoon Trolleys  
F
F
F
Doors Closed  
Overload Relays  
History: 1979 AC; 2002 AACS; 2005 AACS; 2018 AACS.  
R 408.11873 Operational tests.  
Rule 1873. (1) Before a new or modified crane is put into operation or if a crane has not  
been used in the past 12 months, the equipment shall be tested by a designated person to  
ensure compliance with this standard, including all of the following functions:  
(a) Hoisting and lowering.  
(b) Trolley travel.  
(c) Bridge travel.  
(d) Travel limiting devices.  
(e) Locking, limiting, and indicating devices, if provided.  
(2) The trip setting of a hoist limit switch shall be determined with an empty hook  
traveling in increasing speeds up to the maximum speed. The actuating mechanism of the  
limit switch shall be located so that it will trip the switch, under all conditions, in time to  
prevent contact of the hook or hook block with any part of the trolley.  
(3) When a crane is given a load test, the test load shall be not more than 125% of the  
rated load. The test reports shall be maintained on a file within the premises where the  
crane is located.  
History: 2002 AACS; 2005 AACS; 2018 AACS.  
R 408.11874 Rated load test.  
Rule 1874. Before initial use, all new, extensively repaired, and altered cranes shall be  
tested and inspected by or under the direction of a designated or authorized person and a  
written report which confirms the load rating of the crane shall be furnished by the person.  
The load rating shall not be more than 80% of the maximum load sustained during the test.  
Test loads shall not be more than 125% of the rated load, unless otherwise recommended  
by the manufacturer. The test reports shall be placed on file where readily available to  
appointed personnel.  
History: 2002 AACS.  
Page 24  
R 408.11875 Maintenance.  
Rule 1875. (1) An employer shall maintain a crane and its accessories in a condition that  
will not endanger an operator or other employee. A preventative maintenance program  
shall be established and the program shall be based on the manufacturer's recommendations  
and for the application as reviewed by a qualified person.  
(2) An unsafe condition on a crane determined by an inspection shall be corrected by a  
designated trained employee or a qualified crane service company before the crane is put  
into operation. Designated repair personnel shall have a thorough background in either  
mechanical or electrical operating systems, or both, and shall also have a permit to operate  
the type of crane that is being serviced.  
(3) Before adjustments or repairs are commenced on a crane, all of the following  
precautions shall be taken:  
(a) A crane to be repaired shall be moved to a location where it will cause the least  
interference with other moving equipment on the track or rails and operations in the area.  
(b) Controllers shall be placed in the "off" position.  
(c) The main switch shall be placed in the "off" or "open" position and locked out, except  
where power is necessary to adjust or service the crane.  
(d) A warning sign or "out of order" sign shall be placed at the operator control station.  
(e) Illumination of not less than 15 footcandles intensity shall be provided while  
maintenance is performed on a crane.  
(4) If any other crane uses the same runway, then a protective device shall be used to  
prevent interference with the idle crane undergoing repairs. If the protective device is  
impracticable, then a signal person shall be placed at a visual vantage point to warn the  
operator of the active crane when it reaches the limit of safe distance from the idle crane.  
(5) A crane that has been adjusted or repaired shall not be returned to normal operation  
until all guards have been replaced, locks removed by those who installed them, or their  
supervisor, safety devices reactivated, and the maintenance equipment removed.  
(6) Manual lubrication on a crane shall comply with subrule (3)(c) of this rule.  
(7) An accumulation of dirt on a crane that would create a hazardous condition shall be  
removed.  
History: 1979 AC; 2002 AACS.  
Page 25  
;