DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS  
DIRECTOR'S OFFICE  
GENERAL INDUSTRY SAFETY AND HEALTH STANDARD  
(By authority conferred on the director of the department of licensing and regulatory affairs  
by sections 16 and 21 of the Michigan occupational safety and health act, 1974 PA 154,  
MCL 408.1016 and 408.1021, and Executive Reorganization Order Nos. 1996-2, 2003-1,  
2008-4, and 2011-4, MCL 445.2001, 445.2011, 445.2025, and 445.2030)  
PART 20. UNDERHUNG CRANES AND MONORAIL SYSTEMS  
R 408.12001 Scope.  
Rule 2001. This part applies to power-driven cranes, classified as underhung, single-leg  
gantry, and jib, operating on the bottom flange of a track section and to single-track  
monorail systems. This part does not include monorail systems used only to transport  
personnel or to monorail-type conveyor systems commonly referred to as overhead trolley  
conveyors or power and free trolley conveyors. This part does not apply to a crane with a  
manually moved type bridge or trolley.  
History: 1990 AACS.  
R 408.12002 Adoption of standards by reference.  
Rule 2002. (1) The American Society of Mechanical Engineers (ASME) Standard ASME  
B30.11 “Monorail Systems and Underhung Cranes,” 1993 edition, is adopted by reference  
in these rules and is available from IHS Global, 15 Inverness Way East, Englewood,  
Colorado, 80112, USA, telephone number: 1-800-854-7179 or via the internet at the  
following website: http://global.ihs.com, at a cost as of the time of adoption of these rules  
of $60.00.  
(2) The standard adopted in these rules is available for inspection at the Department of  
Licensing and Regulatory Affairs, MIOSHA Regulatory Services Section, 530 West  
Allegan Street, P.O. Box 30643, Lansing, Michigan, 48909-8143.  
(3) Copies of the standard adopted in these rules may be obtained from the publisher or  
may be obtained from the Department of Licensing and Regulatory Affairs, MIOSHA  
Regulatory Services Section, 530 West Allegan Street, P.O. Box 30643, Lansing,  
Michigan, 48909-8143, at the cost charged in this rule, plus $20.00 for shipping and  
handling.  
(4) The following Michigan Occupational Safety and Health Administration (MIOSHA)  
standards are referenced in these rules. Up to 5 copies of these standards may be obtained  
at no charge from the Michigan Department of licensing and regulatory affairs, MIOSHA  
Regulatory Services Section, 530 West Allegan Street, P.O. Box 30643, Lansing, MI,  
48909-8143  
or  
via  
the  
internet  
at  
the  
following  
website:  
Page 1  
www.michigan.gov/mioshastandards. For quantities greater than 5, the cost, at the time of  
adoption of these rules, is 4 cents per page.  
(a) General Industry Safety and Health Standard Part 1. “General Provisions,”  
R 408.10001 to R 408.10098.  
(b) General Industry Safety and Health Standard Part 2. “Walking-Working Surfaces,”  
R 408.10201 to R 408.10241.  
(c) General Industry Safety and Health Standard Part 33. “Personal Protective  
Equipment,” R 408.13301 to R 408.13398.  
History: 1990 AACS; 2013 AACS; 2019 AACS.  
R 408.12004 Definitions; H to M.  
Rule 2004. (1) "Hooker" means an employee who attaches the load to the hook.  
(2) "Hot metal crane" means a crane or monorail system which transports molten metal.  
(3) "Jib crane" means a crane with a horizontal arm (jib) designed to rotate around a  
vertical member.  
(4) "Modified" means a change in design or rating.  
(5) "Monorail system" means an overhead track from which hoisting equipment travels  
to transport loads and includes curves, switches, transfer devices, drop sections, hangers,  
and related equipment.  
History: 1990 AACS.  
R 408.12005 Definitions; P to U.  
Rule 2005. (1) "Preformed" means to permanently shape wires and strands before  
fabrication into wire rope.  
(2) "Pulpit" means an operator compartment located at a fixed position remote from the  
crane or monorail equipment.  
(3) "Safety factor" means the ratio of the breaking strength of a material to the maximum  
designed stress.  
(4) "Seizing" means to bind the end of a wire rope with a soft annealed iron wire.  
(5) "Side pull" means to pull a load with a hoist, chain, or cable other than vertically.  
(6) "Single-leg gantry crane" means a crane similar to an underhung crane, except that the  
bridge for carrying the trolley is rigidly supported on one end by a vertical leg mounted on  
an end truck.  
(7) "Swaged socket" means a fitting into which wire rope is inserted and attached by cold  
forming.  
(8) "Underhung crane" means a crane with a traveling bridge which is suspended under  
its runway track system. A hoist trolley may be underhung or top running.  
History: 1990 AACS.  
CONSTRUCTION, INSTALLATION, AND TESTING  
Page 2  
R 408.12011 Underhung cranes and monorail systems; adoption of standards by  
reference.  
Rule 2011. An underhung crane or monorail system installed, or that portion modified,  
after November 5, 1997, shall be in compliance with the requirements of ASME B30.11  
“Monorail Systems and Underhung Cranes,” 1993 edition, as adopted in R 408.12002.  
History: 1990 AACS; 1997 AACS; 2013 AACS.  
R 408.12012 Cranes and hoists or lifting devices of monorail systems; marking of  
rated capacity.  
Rule 2012. (1) The rated capacity of a crane shall be legibly marked on the crane. If the  
crane has more than one hoisting unit, each hoist shall be legibly marked with its rated  
capacity.  
(2) Each hoist or lifting device of a monorail system shall be legibly marked with its rated  
capacity.  
History: 1990 AACS.  
R 408.12013 Safety factor for hoisting cables; wire rope.  
Rule 2013. (1) The designed safety factor for the hoisting cable on a hot metal crane shall  
be not less than 8 and on any other crane or monorail system shall be not less than 5.  
(2) Wire rope, with an independent wire rope core, shall be used on all molten metal  
applications and in an area where the environmental atmosphere will cause deterioration  
of a hemp center.  
History: 1990 AACS.  
R 408.12014 Single-leg gantry crane; positive mechanical restraint.  
Rule 2014. A single-leg gantry crane used out-of-doors shall be provided with a positive  
mechanical restraint to secure the crane against wind movement while parked. If clamps  
act on the rail heads, beads or weld flash on the rail heads shall be ground off.  
History: 1990 AACS.  
R 408.12015 Controls.  
Rule 2015. (1) Rope controls shall be marked for a floor-operated crane or monorail  
system to show the direction of travel.  
(2) A pendant, radio, cab, or pulpit control station shall be equipped with a positive stop  
device, colored red, to disconnect all motors.  
(3) The controller in a cab or pulpit shall be legibly marked to indicate function and  
direction.  
Page 3  
(4) When the controller of a pendant or radio-controlled type crane is released from the  
"on" position, the controller shall automatically return to the "off" position.  
(5) A transmitter for a radio-controlled crane or a monorail system shall be stored in a  
locked cabinet or a supervised storage area when not in use.  
(6) A crane or monorail system shall be provided with an operable overtravel limit device  
in the hoisting direction. The device shall be adjusted so that it is tripped under all  
conditions to prevent contact of the hook or block with the hoist or trolley frame.  
(7) A crane or monorail system which is not equipped with a spring-return controller or  
momentary contact push button shall be provided with a device which disconnects all  
motors from the line on failure of power and which does not permit restarting until the  
controller handle is brought to the "off" position or until a reset switch or button is operated.  
(8) The pendant push-button enclosure shall be grounded and legibly marked for  
identification of functions.  
History: 1990 AACS.  
R 408.12016 Access, clearances, and barriers.  
Rule 2016. (1) Safe access must be provided to a cab operated crane by a fixed ladder,  
stairway, or walkway.  
(2) Conductors of the open type that are mounted on the crane runway, bridge, or monorail  
beams or overhead must be located or guarded so that an operator at the normal operator’s  
position or persons entering or leaving the cab or crane footwalk could not, under normal  
conditions, come into contact with them.  
(3) A catwalk on a crane must have a guardrail system in compliance with General  
Industry Safety and Health Standard Part 2. “Walking-Working Surfaces,” as referenced  
in R 408.12002. A floor opening in a crane platform, if equipped with a hinged cover, need  
not be equipped with a standard barrier. The cover must be kept closed, except when an  
employee is entering or leaving the opening.  
(4) Safe clearance must be provided between fixed objects and the monorail system where  
there is employee exposure.  
History: 1990 AACS; 2013 AACS; 2019 AACS.  
R 408.12017 Hoisting brakes; equipment handling molten metal.  
Rule 2017. (1) Each independent hoisting unit on a crane or monorail hoisting equipment  
handling molten metal shall be equipped with not less than 2 holding brakes.  
(2) A single brake is permitted where a hot metal monorail hoist is equipped with physical  
stops limiting ladle travel.  
History: 1990 AACS.  
R 408.12018 Attaching hoisting units.  
Rule 2018. Unless the hoisting unit is lug or deck-mounted or an integral part of the  
trolley, the unit shall be attached to the trolley by a clevis or safety hook.  
Page 4  
History: 1990 AACS.  
R 408.12019 Trolley and bridge stops.  
Rule 2019. (1) Stops shall be provided at ends of travel of the trolley or bridge.  
(2) Stops shall be provided at open ends other than the ends of runs. These may occur at  
track switches, interlocking cranes, track opener, lift-out section, turntables, and drop, lift,  
or transfer sections. Such stops shall meet the same safety requirements as the end stop.  
(3) Stops shall be provided to resist forces of impact of a crane or trolley carrying its rated  
load at 40% of the rated speed.  
History: 1990 AACS.  
OPERATORS AND OPERATIONS  
R 408.12021 Operator selection; cab-operated or pulpit-operated equipment.  
Rule 2021. (1) An employer shall be able to demonstrate that an employee is trained and  
qualified to operate the equipment prior to authorizing the employee to operate the  
equipment. A permit system may be used to comply with this rule.  
(2) An employee assigned to operate cab-operated or pulpit-operated equipment shall  
meet the minimum requirements stated in this rule and shall be retested at least once every  
3 years or more often when there is reason to doubt safe operating ability.  
History: 1990 AACS; 2013 AACS.  
R 408.12022 Operator training.  
Rule 2022. An employer shall train a prospective operator before assignment as an  
operator of a crane or monorail system. Training shall include all of the following:  
(a) Capabilities of equipment and attachments.  
(b) Purpose, use, and limitation of controls.  
(c) How to make daily visual inspections.  
(d) Practice in operating assigned equipment through its functions necessary to perform  
the required jobs.  
(e) A review of applicable state standards.  
History: 1990 AACS.  
R 408.12023 Operator testing; cab-operated or pulpit-operated equipment.  
Rule 2023. An employer shall test the knowledge and ability of an employee before  
authorizing the employee to operate a crane or cab-operated or pulpit-operated monorail  
equipment. The test shall determine all of the following with respect to the employee:  
(a) Operating ability.  
Page 5  
(b) Knowledge of equipment.  
(c) Knowledge of daily checks.  
(d) Knowledge of the use of fire extinguishers.  
History: 1990 AACS.  
R 408.12024 Limitations on use of a cab-operated crane or monorail equipment.  
Rule 2024. (1) An employer shall limit the use of a cab-operated crane or monorail  
equipment to the following:  
(a) An employee who has been trained and qualified to operate the type of crane or  
monorail equipment to which the employee is assigned.  
(b) A learner under the direct supervision of a qualified person.  
(c) Its maximum rated capacity.  
(d) Maintenance personnel, during performance of their duties, who have been trained  
and qualified to operate that type of equipment.  
(2) An employer shall establish and implement a safe method, applicable to authorized  
employees, for boarding and leaving a cab-operated crane or monorail equipment.  
(3) An unauthorized employee shall not enter a cab or pulpit.  
History: 1990 AACS.  
R 408.12025 Reporting defects in crane or monorail equipment.  
Rule 2025. (1) An operator shall report any safety defects in a crane or monorail  
equipment to the operator's supervisor.  
(2) A crane or monorail system in need of repair shall have a warning or "out of order"  
sign placed at the operator control station if the crane or monorail system is to be left  
unattended.  
History: 1990 AACS.  
R 408.12026 Personal protective equipment.  
Rule 2026. For personal protective equipment requirements, see General Industry Safety  
Standard Part 33 “Personal Protective Equipment,” as referenced in R 408.12002.  
History: 1990 AACS; 2013 AACS.  
R 408.12031 Operation of equipment; instructions.  
Rule 2031. (1) An operator, when starting on duty, shall comply with the following  
provisions:  
(a) Not close the main switch, disconnect, or emergency contactor until the operator  
checks to see if anyone is on the crane or monorail system.  
(b) Not close the main switch if a warning sign is on the crane or monorail system, hook,  
or main switch.  
Page 6  
(c) Function test the controls and brake or brakes.  
(2) When a load approaches the rated load, the operator shall test the hoisting brake or  
brakes by raising the load a few inches and applying the brake or brakes.  
(3) A hoisting limit switch on equipment or hoisting means shall not be used as an  
operating control unless the equipment is also equipped with a backup limit switch.  
(4) A load shall not be lowered below a point where less than 2 full wraps of wire rope  
remain on the hoisting drum.  
(5) When there is doubt concerning the safety of equipment, an operator shall stop the  
crane or monorail equipment and report the condition creating this doubt to the operator's  
supervisor.  
(6) Before leaving a cab-operated crane or monorail equipment with powered trolley and  
hoist unattended, an operator shall land any attached load, place the controllers in the "off"  
position, and open the main switch or disconnect switch. Before closing a main switch or  
disconnect on a cab-operated crane or monorail system, the operator shall make sure all  
controllers are in the "off" position.  
(7) An operator of a floor-controlled crane or monorail equipment shall land any attached  
load before leaving the crane.  
(8) An operator leaving an outdoor crane shall secure it as prescribed in R 408.12014.  
History: 1990 AACS.  
R 408.12032 Signals; table 1.  
Rule 2032. (1) An operator shall respond to a signal only from the employee directing a  
lift. However, the operator shall obey an emergency stop signal from any employee at all  
times. The signals given an operator shall conform to table 1. When 2 or more cranes are  
used to lift a load, a designated employee shall give all signals.  
(2) Table 1 reads as follows:  
Page 7  
Table 1  
BRIDGE TRAVEL.  
Arm extended forward, hand  
open and slightly raised,  
make pushing motion in  
direction of travel.  
LOWER.  
HOIST.  
With  
arm  
downward,  
extended  
forefinger  
With forearm vertical,  
forefinger pointing up,  
move hand in small  
horizontal circle.  
pointing down, move hand  
in small horizontal circles.  
TROLLEY TRAVEL.  
Palm up, fingers closed,  
thumb pointing in direction  
of motion, jerk hand  
horizontally.  
STOP.  
Arm Extended, palm  
EMERGENCY STOP.  
Arm extended, palm down,  
move hand rapidly right and  
left.  
down,  
rigidly.  
hold  
position  
MOVE SLOWLY.  
MULTIPLE  
TROLLEYS.  
Hold up one finger for  
block marked “1” and two  
MAGNET IS  
DISCONNECTED.  
Crane operator spreads both  
hands apart – palms up.  
Use one hand to give any  
motion signal and place  
other hand motionless in  
Page 8  
Table 1  
fingers for block marked front of hand giving the  
“2”,  
Regular  
signals motion signal.  
(Hoist  
follow.  
slowly shown as example.)  
History: 1990 AACS.  
R 408.12033 Lifting.  
Rule 2033. (1) An operator of a crane or monorail system shall not carry a load over an  
employee.  
(2) An employee shall not place his or her body under a load supported only by a crane  
or monorail system.  
(3) A crane or monorail system shall not be used to make a side pull, except where it has  
been specifically established by a qualified person that such a side pull and possible  
consequent load swing will not endanger employees or result in equipment deterioration  
creating a potential hazard.  
(4) Compressed gas containers shall be lifted only by a cradle or enclosed platform.  
(5) The rated capacity of a crane or monorail system shall not be exceeded, except as  
required for test purposes.  
(6) When attaching or moving a load, the operator or hooker shall insure that all of the  
following provisions are complied with:  
(a) The hoisting rope or chain is free of kinks or twists and not wrapped around the load.  
(b) The load is attached to the load block hook by means of a sling or other approved  
device.  
(c) The sling and load will clear all obstacles or obstructions.  
(d) The load is balanced and secured before lifting the load more than a few inches.  
(e) That multiple lines are not twisted around each other.  
(f) The hook is brought over the load in a manner to prevent swinging.  
(g) Load line slack is gradually removed and there is no sudden acceleration or  
deceleration of the moving load.  
History: 1990 AACS.  
R 408.12034 Warning device; wind-indicating device.  
Rule 2034. (1) A crane or monorail equipment, except a pendant or rope-controlled crane  
or monorail equipment where the operator and other employees in the area of the load can  
see all load movements, shall be equipped with a warning device, such as a flashing light,  
horn, bell, or siren. An operator shall use a warning device before starting and  
intermittently while traveling in an occupied area.  
(2) A wind-indicating device shall be provided on an outdoor storage gantry-type crane  
which gives a visual or audible alarm to the operator at a predetermined wind velocity.  
When the warning is given, the crane shall be secured as prescribed in R 408.12014.  
Page 9  
History: 1990 AACS.  
R 408.12035 Storing tools and other necessary articles; fire extinguisher.  
Rule 2035. (1) Tools and other necessary articles shall be stored in a secured container  
and not allowed to be loose in the cab or on the crane.  
(2) On cab-operated equipment, a class "C" or multi-purpose fire extinguisher shall be  
provided and maintained in a location accessible to the crane operator.  
History: 1990 AACS.  
INSPECTION AND MAINTENANCE  
R 408.12041 Shift inspections.  
Rule 2041. At the beginning of each shift during which a crane or monorail system is  
used, a daily visual inspection shall be made in accordance with table 2. The visual  
inspection shall be limited to that which can be made from a catwalk or other safe  
observation point.  
History: 1990 AACS.  
R 408.12042 Monthly to yearly inspections; records; table 2.  
Rule 2042. (1) Monthly-to-quarterly and yearly inspections shall be made in accordance  
with table 2. Where supported by a documented record, monthly-to-quarterly inspections  
may be scheduled less frequently but not longer than semiannually. Before use, a crane or  
monorail system used in a corrosive atmosphere which has been idle for more than 1 month  
shall be inspected for all items specified in table 2. Where conditions of extreme duty cycle,  
heat, and corrosive or climatic extremes exist, more frequent inspections shall be conducted  
before use.  
(2) Records of all monthly-to-quarterly and yearly inspections shall be kept for not less  
than 2 years.  
(3) Table 2 reads as follows:  
Page 10  
TABLE 2 - MINIMUM INSPECTION SCHEDULE  
MONTHLY TO  
QUARTERLY  
Check for wear,  
distortion and  
fractures  
YEARLY OR  
MORE OFTEN  
ITEM  
Operating  
DAILY  
Visual for function  
Mechanisms  
Visual & operational  
for function  
Check for  
adjustment and wear  
Limit Switches  
Air Systems  
Visual for leaks  
Visual for leaks  
Hydraulic  
Systems  
Visual for leaks and  
abrasions  
Visual for leaks  
Visual For deformation  
and cracks  
Hooks*  
Visual For wear,  
elongations and twist  
Visual for wear,  
elongations and twist  
Visual For wear,  
broken wire, kinks  
Visual for proper  
seating in drum and  
sheave grooves  
Measure for wear  
and elongation  
Chains  
Wire Rope**  
Slings  
Measure for wear  
Measure for wear  
Visual for proper  
seating in drum and  
sheave grooves  
Rope Reeving  
Chain Drive  
Sprockets  
Check for wear  
Drive Chain  
Check for stretch  
Brake System  
***  
Check for  
adjustment and wear  
Functional test  
Check For wear  
and cracks  
Sheaves  
Check For wear  
and cracks  
Drums  
Fasteners  
Check for tightness  
Check electrical  
components for  
function, loose  
connections &  
deterioration  
Electrical  
Apparatus  
Lock and  
Clamp Mooring  
Devices  
Check for wear,  
distortion and  
fractures  
Visual for function  
and wear  
Check hangers and  
fasteners  
Cab  
Page 11  
TABLE 2 - MINIMUM INSPECTION SCHEDULE  
MONTHLY TO  
QUARTERLY  
YEARLY OR  
MORE OFTEN  
ITEM  
DAILY  
Load, Wind and  
Other Indicators  
Accuracy  
Performance and  
safety requirements  
Power Plants  
End Stops on  
Bridge  
Visual to ensure they  
are in place  
Check bolts for  
tightness and wear  
*See rule 2045  
**See rule 2044  
***See rule 2031(1)(c)  
History: 1990 AACS.  
R 408.12043 Maintenance of equipment: correction of unsafe condition;  
precautions; returning equipment to normal operation; removing dirt and debris.  
Rule 2043. (1) An employer shall maintain a crane, monorail system, and their accessories  
in a condition that does not endanger an operator or other employee.  
(2) Before adjustments or repairs are commenced on a crane or monorail system, all of  
the following precautions shall be taken:  
(a) A crane shall be repaired in a location where it causes the least interference with other  
moving equipment on the track or rails and operations in the area.  
(b) Controllers shall be placed in the “off” position.  
(c) Where an employee is working at or near a disabled crane and there is a parallel  
runway on that side, or where a section of track or runway is being repaired or replaced,  
and a hazard exists to the employee, the requirements of subrule (3) of this rule apply.  
(d) The power to the crane or monorail system shall be locked out in accordance with R  
408.10132 of General Industry Safety Standard Part 1 “General Rules,” as referenced in R  
408.12002.  
(3) Where any other crane or monorail systems uses the same runway, a protective device  
shall be used to prevent interference with the idle crane or monorail systems undergoing  
repairs. Where the protective device is impractical, a signalman shall be placed at a visual  
vantage point to warn the operator of the active crane or monorail system when it reaches  
the limit of safe distance from the idle crane.  
(4) A crane or monorail equipment that has been adjusted or repaired shall not be returned  
to normal operation until all guards have been replaced, locks removed, safety devices  
reactivated, and the maintenance equipment removed.  
(5) An accumulation of dirt or debris on a crane or monorail equipment that may create a  
hazardous condition shall be removed.  
History: 1990 AACS; 2013 AACS.  
R 408.12044 Wire rope.  
Page 12  
Rule 2044. (1) A wire rope used on a crane or monorail equipment shall be replaced if  
any of the following conditions exist:  
(a) Within a segment of 8 diameters in length, the total number of broken wires exceeds  
10% of the total number of wires.  
(b) The wire rope has been kinked, crushed, or bird-caged or has sustained any other  
damage which distorts the wire rope structure.  
(c) The wire rope shows heat or corrosive damage.  
(2) If wire rope is discarded from a crane or monorail equipment because of a condition  
specified in subrule (1) of this rule, the damaged portion shall not be used for a sling.  
(3) Wire rope for a crane or monorail equipment that has been clipped or spliced to form  
an eye shall be equipped with a thimble or equivalent.  
(4) An end fitting shall be a clamp, swage socket, or a zinc, or equivalent poured socket.  
Before cutting wire rope, seizings shall be placed as follows:  
(a) One seizing on each side of the cut on a preformed wire rope.  
(b) Two seizings on each side of 7/8-inch size or smaller nonpreformed wire rope.  
(c) Three seizings on each side of 1-inch or larger size nonpreformed wire rope.  
History: 1990 AACS.  
R 408.12045 Hooks.  
Rule 2045. (1) A crane or monorail equipment hook shall be discarded for any of the  
following reasons:  
(a) The throat opening is more than 15% larger than the manufactured size.  
(b) The hook has more than a 10-degree twist from a vertical centerline drawn through  
the hook socket.  
(c) The hook is cracked.  
(2) A discarded hook shall not be repaired or rebuilt and placed back in service.  
History: 1990 AACS.  
Page 13  
;