(4) "Trench jack" means a screw or hydraulic jack used as a brace in a trench shoring
system.
(5) "Trench shield," sometimes called a trench box, means a trench shoring system
composed of steel plates and bracing, welded or bolted together, which can be moved
along as work progresses.
(6) "Uprights" mean the vertical members of a trench shoring system.
History: 1979 AC; 2023 AACS.
R 408.40931 Locating utility lines.
Rule 931. (1) An employer shall not excavate in a street, highway, public place, a private
easement of a public utility, or near the location of a public utility facility owned,
maintained, or installed on a
customer's premises, without having first ascertained the location of all underground
facilities of a public utility in the proposed area of excavation.
(2) Upon receiving the information from the public utility, an employer shall exercise
reasonable care when working in close proximity to the underground facilities of any public
utility. If the facilities are to be exposed, or are likely to be exposed, only hand digging
shall be employed in such circumstances and such support, as may be reasonably necessary
for protection of the facilities, shall be provided in and near the construction area.
(3) When any contact with, or damage to, any pipe, cable, or its protective coating, or any
other underground facility of a public utility
occurs, the public utility shall be notified immediately by the employer responsible for
operations causing the damage. If an energized electrical cable is severed, an energized
conductor is exposed, or dangerous fluids or gases are escaping from a broken line, the
employer shall evacuate the employees from the immediate area while awaiting the arrival
of the public utility personnel.
History: 1979 AC.
R 408.40932 Excavation; consideration of soil types; water; slide hazards.
Rule 932. (1) If different textured soils are encountered in the side of an excavation,each
soil type of the excavation shall be cut to the proper angle of repose, except that the slope
shall not steepen between the toe of the slope and the ground level where soft clay or
running soil is encountered in the lower cut.
(2) An employee shall not work in an excavation in which there is accumulated water or
in which water is accumulating unless precautions have been taken to protect employees
against the hazards posed by water accumulation. The precautions necessary to protect
employees adequately vary with each situation, but may include special supportor shield
systems to protect from cave-ins, water removal to control the level of accumulating water,
or the use of a safety harness and lifeline.
(3) If water is controlled or prevented from accumulating by the use of water removal
equipment, the water removal equipment and operation shall be monitored by a competent
person or a monitoring system to ensure that the equipment is properly operated.
Page 4